亚洲中文字幕无码不卡电影 ,精品人妻无码一区二区三区蜜桃一,国产免费人成视频在线观看,精品无码国产自产拍在线观看

Chaosheng bathroom teaches you the installation precautions of shower!
  • Date:2023-02-25
  • Read:2783
1. The distance between the cold and hot water outlets is 13-15 / cm and parallel and vertical. The constant temperature shower requires that the water outlet must be hot on the left and cold on the right. The water outlet shall not be concave into the ceramic tile surface for more than 0.5cm.
2. Drain the water for 15 seconds and clean the sediment and impurities in the pipeline to avoid blocking the valve core.
3. When installing the main body, pay attention to check whether there is 6 sealing water gasket. Cushion cloth must be used when fixing the nut to prevent scratching the surface
Prev

What are the general types of faucet materials?

Next

Purchasing skills of fabricated bathroom